ECN Setup

ECN Setup

Part 1: Create ECN reason codes
1. Click the Open icon on the toolbar. The Select Form dialog box opens.
1. Type ecn reason in the Filter field.
2. Click the ECN Reason Codes list item. 
3. Click the OK button. The ECN Reason Codes form opens. 
4. Click the New Icon.
5. Type 06 in the Code field. Note: this is a three digit alphanumeric field.
6. Type Incorrect dimensions in the Description field.
7. Click the New Icon.
8. Type 07 in the Code field.
9. Type New enhancement to product in the Description field.
10. Click the New Icon.
11. Type 08 in the Code field.
12. Type Change in customer specification in the Description field.
13. Click the Save icon. 
14. Click the X on the ECN Reason Codes form.
Part 2: Create ECN Priority Codes
1. Click the Open icon on the toolbar.
2. Type ecn priority in the Filter field.
3. Click the ECN Priority Codes list item. 
4. Click the OK button. The ECN Priority Codes form opens. 
5. Click the New Icon.
6. Type 05 in the Code field. Note: this is a three digit alphanumeric field.
7. Type Within Next MPS in the Description field.
8. Click the New Icon.
9. Type 06 in the Code field.
10. Type Within Next Planning Horizon in the Description field.
11. Click the Save icon. 
12. Click the X on the ECN Priority Codes form.
Part 3: Create ECN Distribution Codes
1. Click the Open icon on the toolbar. The Select Form dialog box opens.
2. Type ecn distr in the Filter field.
3. Click the ECN Distribution Codes list item. 
4. Click the OK button. The ECN Distribution Codes form opens. 
5. Click the New Icon.
6. Type 07 in the Code field. Note: this is a three digit alphanumeric field.
7. Type Outside Vendors in the Description field.
8. Click the Save icon. 
9. Click the X on the ECN Distribution Codes form
    • Related Articles

    • Post ECN

      Part 1: Post the ECN 1. Click the Open icon on the toolbar. 2. Type post eng in the Filter field. 3. Click the Post Engineering Change Notice list item. 4. Click the OK button. The Post Engineering Change Notice form opens. 5. Click the ECN drop-down ...
    • ECN Creation

      Part 1: Turn on revision tracking 1. Click the Open icon on the toolbar. 2. Type items in the Filter field. 3. Click the Items list item. 4. Click the OK button. The Items (Filter in Place) form opens. 5. Type sa-61500 in the Items field. 6. Click ...
    • Approve an ECN

      1. Click the Open icon on the toolbar. 2. Type change ecn in the Filter field. 3. Click the Change ECN Status Utility list item. 4. Click the OK button. The Change ECN Status Utility form opens. 5. Verify Requested is selected in the From Status ...
    • ECN material update, operation update and mass substitution

      Part 1: Perform material and operation updates 1. Click the Open icon on the toolbar. 2. Type engineering ch in the Filter field. 3. Click the Engineering Change Notice list item. 4. Click the OK button. The Engineering Change Notices (Filter in ...
    • Inventory setup

      Part 1: Verify general inventory parameters 1. Click the Open icon on the toolbar. The Select Form dialog box opens. 2. Type inventory parameters in the Filter field. 3. Click the Inventory Parameters list item. 4. Click the OK button. The Inventory ...